Water & Waste Water
Roads & Highways
Bridges & Flyovers
Irrigation & Land Drainage
Harbours & Marine Work
Dredging & Reclamation
Environment & Waste Management
Telecommunication
Piling & Buildings
Engineering Designs
 
Highway Design of 42 Km long road stretch - AFD Funded Trincomalee Integrated infrastructure Project
 
 
  Highway Design of 42 Km long road stretch - AFD Funded Trincomalee Integrated infrastructure Project
   
 

Design of 42km road from Valachchaina to Verugal included geometric design and pavement design (DBST) including culverts & side drains. Culverts consist of new constructions and rehabilitations. Auto Cad Civil 3D software was used for geometric design of road. The proposed road was 2 lane 6.5m wide and having 0.85 soft shoulders on either side.

 

     
     
   
 
 
     
Home  |   About Us   |   Careers   |   CSR   |   Contact Us  |  Site Map  |  Member Login
 
Copyright © 2011 Access Engineering. All rights reserved. Solution by